[Photocopy of a 49 page report submitted by the Office of the Chief Engineer, Maintenance of Way, of the Penn Central Company, of each bridge along the right of way with various details about the bridge including type, number of tracks, number and length of span, vertical distance, year it was built, posted load limit, capacity calucations and public utility commission jurisdiction.]